Market intelligence

The data layer
SAF was missing.

537 verified production projects across 51 countries · 341 manufacturers · regulatory monitor · feedstock pricing · 80-term glossary. One platform, one schema, one source of truth. Members get the live workspace; everyone gets the methodology.

537
Verified SAF production projects
51
Countries with tracked SAF capacity
341
Manufacturers + technology partners
1-5
Confidence rating per data field
SAF Price IndicesPreview
Pathway$/tonneTypeSource
HEFA
Hydroprocessed Esters & Fatty Acids
2,174
USD/t CIF NWE
Market
S&P Global Platts
Week to 18 Feb 2026
PtL
Power-to-Liquid (e-SAF)
8,310
USD/t EASA Ref.
Reference
EASA Reference Price
2024 (converted at 1.08)
ATJ
Alcohol-to-Jet
~2,000
USD/t MSP 2025
MSP
IATA SAF Brief
Min. Selling Price
FT
Fischer-Tropsch
~2,400
USD/t MSP 2025
MSP
IATA SAF Brief
Min. Selling Price
Market = traded price assessment. Reference = regulatory reference price (EASA, converted EUR→USD at 1.08). MSP = modelled minimum selling price, excl. logistics and certification.
Fossil Jet A-1 benchmark: ~$650/t. All figures in USD. No investment advice.

What's included

Everything you need
to read the market.

SAF Price Indices
Daily and weekly benchmarks for all major production pathways · PtL, HEFA, ATJ, FT · aggregated from global trading activity.
Project Tracker
SAF production projects tracked by stage, fuel type, capacity, financing status, and expected commissioning date. Every entry manually verified.
Policy Monitor
Real-time tracking of ReFuelEU, CORSIA, IRA, and national SAF policies. Plain-language summaries with direct commercial implications.
Viability Scoring
Proprietary project viability scores combining feedstock availability, policy support, offtake probability, and financing conditions · updated quarterly.
Certificate Prices
Emerging price data for SAF certificates under CORSIA, ReFuelEU book-and-claim, and voluntary corporate markets. The only source tracking this systematically.
API & Export
All data accessible via REST API and CSV export for integration into your own models and dashboards. Rate limits and SLAs matched to your subscription tier.

Project Registry

Loading production facilities\u2026
Verified open-source intelligence.

The most comprehensive SAF facility tracker on the web. Cross-referenced from public disclosures, trade press, and the SAF Monitor 2025 dataset. Filter by status, region, country, technology pathway, certification, or regulatory framework.

Unit
306 projects

Legal Disclaimer & Data Sources

No Warranty; Informational Purposes Only. All data, analyses, capacity figures, project statuses, and related information presented on this platform (collectively, the “Content”) are compiled exclusively from publicly available sources—including but not limited to corporate press releases, regulatory filings, government publications, industry association reports, and reputable news outlets. The Content is provided strictly on an “as-is” and “as-available” basis for general informational and educational purposes only and does not constitute professional, financial, investment, legal, or engineering advice of any kind.

No Forward-Looking Guarantees. Certain statements herein may relate to future expectations, projections, planned capacities, anticipated commissioning dates, or development milestones. Such statements are inherently uncertain and subject to material risks, including but not limited to changes in regulation, technology, market conditions, financing availability, permitting decisions, and force majeure events. Actual outcomes may differ materially from any projections or estimates provided. No representation or warranty—express, implied, or statutory—is made as to the accuracy, completeness, reliability, timeliness, or fitness for a particular purpose of any Content.

Limitation of Liability. To the fullest extent permitted by applicable law, the publisher, its affiliates, contributors, and data providers disclaim all liability for any direct, indirect, incidental, consequential, special, or exemplary damages arising from or in connection with the use of, reliance upon, or inability to use the Content—even if advised of the possibility of such damages. Users assume all risk associated with any decisions made based on information contained herein.

Third-Party Content & Links. This platform may contain hyperlinks to external third-party websites, databases, and resources. Such links are provided solely as a convenience; their inclusion does not imply endorsement, verification, or responsibility for the content, accuracy, or availability of those external resources. The publisher exercises no editorial control over third-party content and bears no liability for its accuracy or accessibility.

Data Methodology
All project data has been gathered through systematic online research of publicly accessible sources. Capacity figures reflect the most recent publicly available information at the time of compilation and are subject to revision as new data becomes available. Where multiple sources report differing figures, the most conservative estimate has been adopted.
Intellectual Property
All trademarks, trade names, logos, and brand references remain the property of their respective owners and are used herein solely for identification and informational purposes. Their use does not imply any affiliation with, or endorsement by, the respective rights holders.
Market Snapshot

The numbers behind
the opportunity.

306
Projects
Tracked
47
Countries
Covered
56
Operating
Facilities
600 kt
e-SAF Required
EU 2030

Key Market Signals

Four dynamics shaping
the next 36 months.

Everything in this market reduces to four structural forces. Each one alone moves billions. Together they create the fastest-growing energy transition segment on the planet.

§

Mandate-Guaranteed Demand

ReFuelEU mandates 1.2% e-SAF by 2030, rising to 35% by 2050. Non-compliance penalties at 2x the fossil-SAF price gap. UK mandates 10% SAF by 2030 with separate PtL obligation. Japan: 10% by 2030 (1.4M tonnes). US Grand Challenge: 3B gallons by 2030. This is not optional demand · it is legally irrevocable.

Structural
$

Institutional Capital Arriving

Climate-infrastructure funds and Tier-1 commercial banks are entering e-SAF project finance. Typical rounds now combine climate-PE anchor equity, strategic corporates, and senior project debt. The asset class is no longer venture-grade · infra capital is pricing in mandate-guaranteed returns. Specific parties and amounts for in-flight transactions are disclosed to verified Deal Room members under NDA.

Bullish
!

The FID Gap

Of 306 tracked projects, only 56 are operating · the rest are in FEED, announced, or on hold. Build cycles: 3–4 years minimum. Math is rigid: FIDs must close in 2025/2026 or the 2030 mandates face a physical supply deficit. Announced capacity is not built capacity.

Risk

Cost Curve Acceleration

e-SAF today: $4,000–6,500/t. Fossil Jet A-1: ~$650/t. The gap is 6–10x. By 2030: projected 3.5x. By 2050: 2.5x. Over 60% of OPEX is electricity + electrolysis. Modular manufacturing targets 60% electrolyzer cost reduction. Emerging plasma-chemistry routes claim 86% efficiency at 1/6th the energy input.

Bullish

Deal Tracker · public tier

Deal archetypes under
working titles.

Project names are codenames / working titles. Amounts and counterparty identities are masked in the public tier. Cards below show only the transaction archetype. Verified Deal Room members receive full terms under NDA.

Working titles The rows below are codenamed deal structures. They do not identify real parties, do not disclose amounts, and do not represent confirmed, pending, or historical transactions. Anyone who needs identities or terms must become a verified Deal Room member.
Working title Amount Type Key counterparties Archetype
••• Codename A-01 masked Equity + Debt masked Large-scale FOAK financing (equity + project debt)
••• Codename A-02 masked Long-term Offtake masked Multi-year airline-consortium offtake
••• Codename B-01 masked Equity + Debt masked Tier-1 bank project debt in e-fuels
••• Codename B-02 masked Take-or-Pay masked Book-and-claim with bank-led emission credits
••• Codename C-01 masked Grant + Loan masked Multilateral de-risking (DFI + blended grant)
••• Codename C-02 masked EU Innovation Fund masked FOAK grant for modular replication
••• Codename D-01 masked Supply Agreement masked HEFA-SAF cross-border supply lock
••• Codename D-02 masked MoU long-horizon masked Integrated-supplier / flag-carrier volume MoU
••• Codename E-01 masked Strategic masked Adjacent-industry corporate entering upstream supply

Regional Breakdown

Where the market is.
Where it's going.

SAF demand and production capacity are distributed unevenly. Policy drives geography. Wind and sun drive economics.

North America
66
Tracked facilities. IRA tax credits. SAF Grand Challenge: 3B gal by 2030, 35B by 2050. Named projects: Diamond Green Diesel Port Arthur, Montana Renewables, LanzaJet Freedom Pines (GA). Additional e-SAF projects in the pipeline are tracked under working titles until disclosure.
Europe
104
Tracked facilities · the largest cluster globally. ReFuelEU is the strictest mandate. Hubs: Denmark (Ørsted, European Energy), Norway (Norsk e-Fuel), Germany (INERATEC, Concrete Chemicals), Netherlands (Neste, SkyNRG, Synkero).
Asia
50
China as second-largest project hub (Sinopec, EcoCeres, Jiaao). Japan: 10% mandate by 2030 (1.4 Mt). India, South Korea piloting. Region supplies 69% of EU's HEFA-SAF imports.
Latin America
17
HIF Haru Oni operational in Patagonia. Brazil: Acelen, Petrobras, BBF. Chile and Uruguay driving lowest LCOE globally with Patagonian wind. Paraguay (ECB Group).
Middle East
5
ADNOC Ruwais operating. Satorp (Saudi Arabia). NEOM green hydrogen hub. SAF One multi-country build. Strategic positioning as future sustainable fuel exporter.
Oceania / Africa
12
Australia: Wagner Wellcamp blending, HIF Tasmania, bp Kwinana, JetZero Queensland. New Zealand piloting with LanzaJet. Africa: Sasol HyShiFT (South Africa), ANRPC Egypt.
Facility counts from the verified project registry above. Sources: SAF Monitor 2025, Fortune Business Insights, T&E Pipeline Analysis, EASA Annual Report 2024, ICAO.


Access

Early access.
Founder pricing.

The first 100 network members get permanent access to Market Intelligence at a fixed founding rate.

Request early access